Abstract

H-H joint of "H-jointed SPSP with H-H joint", which is made up of interlocking two H-steel sections of different sizes, is the one of SPSP's joint to improve the hydraulic conductivity. "H-H jointed SPSP with H-H joint" is expected to be applied to a vertical cutoff wall in coastal landfill sites. In H-jointed SPSP with H-H joint, the H-joint is completely imperviousness. H-H joint, however, is pervious at interlocked state because a gap of 8 to 11 mm is left between the interlocking flanges therefore a water interception treatment must be conducted to seal the gap. The water shielding treatment of H-H joint is executed by coating the gaps with a water-swelling sheet of paint before its installation. Then, hollow space is generated in H-H joint after treating by water-swelling sheet, and that space can be used effectively. This paper proposes leachate control technologies using H-H joint interior space of SPSP cutoff walls. The possibility of those technologies and hydraulic conductivity of H-jointed SPSP with H-H joints are demonstrated by conducting the hydraulic conductivity test.

Original languageEnglish
Title of host publication14th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering
Publication statusPublished - 2011
Externally publishedYes
Event14th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering, ARC 2011 - Hong Kong
Duration: 2011 May 232011 May 27

Other

Other14th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering, ARC 2011
CityHong Kong
Period11/5/2311/5/27

Fingerprint

joints (wood)
cutoff wall
landfills
leachates
Land fill
leachate
landfill
Hydraulic conductivity
Hydrogen
Swelling
Water
hydraulic conductivity
Flanges
Paint
Shielding
Seals
water treatment
swelling
Coatings
Steel

ASJC Scopus subject areas

  • Soil Science
  • Geotechnical Engineering and Engineering Geology

Cite this

Inazumi, S., & Kakuda, T. (2011). Leachate control technology using SPSP cutoff walls at coastal landfills. In 14th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering

Leachate control technology using SPSP cutoff walls at coastal landfills. / Inazumi, Shinya; Kakuda, T.

14th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering. 2011.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Inazumi, S & Kakuda, T 2011, Leachate control technology using SPSP cutoff walls at coastal landfills. in 14th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering. 14th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering, ARC 2011, Hong Kong, 11/5/23.
Inazumi S, Kakuda T. Leachate control technology using SPSP cutoff walls at coastal landfills. In 14th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering. 2011
Inazumi, Shinya ; Kakuda, T. / Leachate control technology using SPSP cutoff walls at coastal landfills. 14th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering. 2011.
@inproceedings{07816ff436d24fc3aa306a4bc0e356fa,
title = "Leachate control technology using SPSP cutoff walls at coastal landfills",
abstract = "H-H joint of {"}H-jointed SPSP with H-H joint{"}, which is made up of interlocking two H-steel sections of different sizes, is the one of SPSP's joint to improve the hydraulic conductivity. {"}H-H jointed SPSP with H-H joint{"} is expected to be applied to a vertical cutoff wall in coastal landfill sites. In H-jointed SPSP with H-H joint, the H-joint is completely imperviousness. H-H joint, however, is pervious at interlocked state because a gap of 8 to 11 mm is left between the interlocking flanges therefore a water interception treatment must be conducted to seal the gap. The water shielding treatment of H-H joint is executed by coating the gaps with a water-swelling sheet of paint before its installation. Then, hollow space is generated in H-H joint after treating by water-swelling sheet, and that space can be used effectively. This paper proposes leachate control technologies using H-H joint interior space of SPSP cutoff walls. The possibility of those technologies and hydraulic conductivity of H-jointed SPSP with H-H joints are demonstrated by conducting the hydraulic conductivity test.",
author = "Shinya Inazumi and T. Kakuda",
year = "2011",
language = "English",
booktitle = "14th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering",

}

TY - GEN

T1 - Leachate control technology using SPSP cutoff walls at coastal landfills

AU - Inazumi, Shinya

AU - Kakuda, T.

PY - 2011

Y1 - 2011

N2 - H-H joint of "H-jointed SPSP with H-H joint", which is made up of interlocking two H-steel sections of different sizes, is the one of SPSP's joint to improve the hydraulic conductivity. "H-H jointed SPSP with H-H joint" is expected to be applied to a vertical cutoff wall in coastal landfill sites. In H-jointed SPSP with H-H joint, the H-joint is completely imperviousness. H-H joint, however, is pervious at interlocked state because a gap of 8 to 11 mm is left between the interlocking flanges therefore a water interception treatment must be conducted to seal the gap. The water shielding treatment of H-H joint is executed by coating the gaps with a water-swelling sheet of paint before its installation. Then, hollow space is generated in H-H joint after treating by water-swelling sheet, and that space can be used effectively. This paper proposes leachate control technologies using H-H joint interior space of SPSP cutoff walls. The possibility of those technologies and hydraulic conductivity of H-jointed SPSP with H-H joints are demonstrated by conducting the hydraulic conductivity test.

AB - H-H joint of "H-jointed SPSP with H-H joint", which is made up of interlocking two H-steel sections of different sizes, is the one of SPSP's joint to improve the hydraulic conductivity. "H-H jointed SPSP with H-H joint" is expected to be applied to a vertical cutoff wall in coastal landfill sites. In H-jointed SPSP with H-H joint, the H-joint is completely imperviousness. H-H joint, however, is pervious at interlocked state because a gap of 8 to 11 mm is left between the interlocking flanges therefore a water interception treatment must be conducted to seal the gap. The water shielding treatment of H-H joint is executed by coating the gaps with a water-swelling sheet of paint before its installation. Then, hollow space is generated in H-H joint after treating by water-swelling sheet, and that space can be used effectively. This paper proposes leachate control technologies using H-H joint interior space of SPSP cutoff walls. The possibility of those technologies and hydraulic conductivity of H-jointed SPSP with H-H joints are demonstrated by conducting the hydraulic conductivity test.

UR - http://www.scopus.com/inward/record.url?scp=84867172519&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84867172519&partnerID=8YFLogxK

M3 - Conference contribution

BT - 14th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering

ER -