METHODOLOGICAL STUDY ON PERSONAL COMPUTER-BASED MANAGEMENT SYSTEM DEVELOPMENT FOR CONSTRUCTION PLANNING AND SCHEDULING.

Masaaki Ikeda, Kazuyoshi Yoshikawa, Mamoru Haruna

Research output: Contribution to journalArticle

Abstract

It is well known that network technique, e. g. PERT/CPM, has not been utilized in construction site offices for planning and scheduling. We have tried to renew PERT/CPM, and we have developed a personal computer-based management system called PF-NETS, Planning Forecasting-NETwork System. In this paper, we present our recent results of study. The purposes of this research project are: (a) to demonstrate the viability of applying this system, (b) to find out problems, and (c) to show the way to explore them by A. I. techniques. In this process we discovered a new concept which indicates a discrepancy between hierarchical networks. We named the higher level network 'Conceptional Network'.

Original languageEnglish
Pages (from-to)179-187
Number of pages9
JournalDoboku Gakkai Rombun-Hokokushu/Proceedings of the Japan Society of Civil Engineers
Volume8
Issue number391
Publication statusPublished - 1988 Mar
Externally publishedYes

    Fingerprint

ASJC Scopus subject areas

  • Engineering(all)

Cite this