Partial discharge measurement on three phase construction

Umar Khayam, Shinya Ohtsuka, Satoshi Matsumoto, Masayuki Hikita

Research output: Chapter in Book/Report/Conference proceedingConference contribution

11 Citations (Scopus)

Abstract

This paper deals with partial discharge measurement on three phase construction. It was shown that the measurement must be conducted on all phases simultaneously to obtain measurement result of partial discharge occurring in whole region of three phase construction with high sensitivity and to obtain information of the partial discharge location. Partial discharge from artificial defect was measured. Experimental results showed some special characteristics of partial discharge in three phase construction. These results were discussed with considering electric field characteristic in three phase construction and coupling capacitance between three phase conductors and between the conductors and the tank.

Original languageEnglish
Title of host publicationProceedings of ICPADM 2006 - 8th International Conference on Properties and Applications of Dielectric Materials
PublisherInstitute of Electrical and Electronics Engineers Inc.
Pages301-304
Number of pages4
ISBN (Print)1424401895, 9781424401895
DOIs
Publication statusPublished - 2006 Jan 1
Externally publishedYes
EventICPADM 2006 - 8th International Conference on Properties and Applications of Dielectric Materials - Bali, Indonesia
Duration: 2006 Jun 262006 Jun 30

Publication series

NameProceedings of the IEEE International Conference on Properties and Applications of Dielectric Materials

Conference

ConferenceICPADM 2006 - 8th International Conference on Properties and Applications of Dielectric Materials
Country/TerritoryIndonesia
CityBali
Period06/6/2606/6/30

Keywords

  • Crosstalk
  • Electric field
  • Partial discharge
  • Three phase voltage

ASJC Scopus subject areas

  • Electronic, Optical and Magnetic Materials
  • Condensed Matter Physics
  • Materials Chemistry

Fingerprint

Dive into the research topics of 'Partial discharge measurement on three phase construction'. Together they form a unique fingerprint.

Cite this