Abstract

At Present, the environmental protection penetrates public awareness to decrease atmospheric emissions as important efforts for increasing living quality in air from various gaseous effects. Technically, it has forced industrial sectors to control pollutant productions while operating machineries of engineering processes to keep all contaminant materials. This condition has also forced the power system operation to modify operational strategies of thermal power plants considered pollutant productions from combustions of fossil fuels for reducing emissions. This paper demonstrates new approaches for measuring pollutant penetrations embedded in the single priority function considered an emission standard, a dynamic penalty factor, and Thunderstorm Algorithm (TA). By considering the IEEE 62-bus system model, results obtained show that the hourly computation has different performances for the 24 hours operation. It also indicates that pollutant discharges are dominated gradually by higher contributors associated with scheduled power plants. The convergence speed of TA is smooth and fast for determining the optimal solution, which are ranged in 6-20 for the cycle and 1.8-3.8 s for the time consumption. Moreover, the 24 hours operation is powered totally in 60,826.10 MW for feeding the total load of 56,820.50 MW. This operation also spends in 291,870.60 $ for the fuel procurement and 83,233.70 $ for the compensation of the pollutant production during existing 19 generating units. In total, the accumulation of pollutant discharges from 19 power plants is 68,012.20 kg.

Original languageEnglish
Pages (from-to)1825-1831
Number of pages7
JournalInternational Journal on Advanced Science, Engineering and Information Technology
Volume7
Issue number5
DOIs
Publication statusPublished - 2017 Jan 1

Fingerprint

Evolutionary algorithms
Thunderstorms
Power plants
pollutants
power plants
Environmental protection
Fossil fuels
Impurities
air quality
environmental protection
fossil fuels
Air
combustion
engineering
heat

Keywords

  • Economic operation
  • Emission dispatch
  • Penalty factor
  • Power system
  • Thunderstorm algorithm

ASJC Scopus subject areas

  • Computer Science(all)
  • Agricultural and Biological Sciences(all)
  • Engineering(all)

Cite this

The penetration of pollutant productions on dynamic generated power operations optimized using a novel evolutionary algorithm. / Afandi, A. N.; Sulistyorini, Yunis; EL-Shimy, M.; Gao, X. Z.; Fujita, Goro; Miyauchi, Hajime.

In: International Journal on Advanced Science, Engineering and Information Technology, Vol. 7, No. 5, 01.01.2017, p. 1825-1831.

Research output: Contribution to journalArticle

@article{1ae67e84be9e46e3ab3a82a3808f14bc,
title = "The penetration of pollutant productions on dynamic generated power operations optimized using a novel evolutionary algorithm",
abstract = "At Present, the environmental protection penetrates public awareness to decrease atmospheric emissions as important efforts for increasing living quality in air from various gaseous effects. Technically, it has forced industrial sectors to control pollutant productions while operating machineries of engineering processes to keep all contaminant materials. This condition has also forced the power system operation to modify operational strategies of thermal power plants considered pollutant productions from combustions of fossil fuels for reducing emissions. This paper demonstrates new approaches for measuring pollutant penetrations embedded in the single priority function considered an emission standard, a dynamic penalty factor, and Thunderstorm Algorithm (TA). By considering the IEEE 62-bus system model, results obtained show that the hourly computation has different performances for the 24 hours operation. It also indicates that pollutant discharges are dominated gradually by higher contributors associated with scheduled power plants. The convergence speed of TA is smooth and fast for determining the optimal solution, which are ranged in 6-20 for the cycle and 1.8-3.8 s for the time consumption. Moreover, the 24 hours operation is powered totally in 60,826.10 MW for feeding the total load of 56,820.50 MW. This operation also spends in 291,870.60 $ for the fuel procurement and 83,233.70 $ for the compensation of the pollutant production during existing 19 generating units. In total, the accumulation of pollutant discharges from 19 power plants is 68,012.20 kg.",
keywords = "Economic operation, Emission dispatch, Penalty factor, Power system, Thunderstorm algorithm",
author = "Afandi, {A. N.} and Yunis Sulistyorini and M. EL-Shimy and Gao, {X. Z.} and Goro Fujita and Hajime Miyauchi",
year = "2017",
month = "1",
day = "1",
doi = "10.18517/ijaseit.7.5.1635",
language = "English",
volume = "7",
pages = "1825--1831",
journal = "International Journal on Advanced Science, Engineering and Information Technology",
issn = "2088-5334",
publisher = "INSIGHT - Indonesian Society for Knowledge and Human Development",
number = "5",

}

TY - JOUR

T1 - The penetration of pollutant productions on dynamic generated power operations optimized using a novel evolutionary algorithm

AU - Afandi, A. N.

AU - Sulistyorini, Yunis

AU - EL-Shimy, M.

AU - Gao, X. Z.

AU - Fujita, Goro

AU - Miyauchi, Hajime

PY - 2017/1/1

Y1 - 2017/1/1

N2 - At Present, the environmental protection penetrates public awareness to decrease atmospheric emissions as important efforts for increasing living quality in air from various gaseous effects. Technically, it has forced industrial sectors to control pollutant productions while operating machineries of engineering processes to keep all contaminant materials. This condition has also forced the power system operation to modify operational strategies of thermal power plants considered pollutant productions from combustions of fossil fuels for reducing emissions. This paper demonstrates new approaches for measuring pollutant penetrations embedded in the single priority function considered an emission standard, a dynamic penalty factor, and Thunderstorm Algorithm (TA). By considering the IEEE 62-bus system model, results obtained show that the hourly computation has different performances for the 24 hours operation. It also indicates that pollutant discharges are dominated gradually by higher contributors associated with scheduled power plants. The convergence speed of TA is smooth and fast for determining the optimal solution, which are ranged in 6-20 for the cycle and 1.8-3.8 s for the time consumption. Moreover, the 24 hours operation is powered totally in 60,826.10 MW for feeding the total load of 56,820.50 MW. This operation also spends in 291,870.60 $ for the fuel procurement and 83,233.70 $ for the compensation of the pollutant production during existing 19 generating units. In total, the accumulation of pollutant discharges from 19 power plants is 68,012.20 kg.

AB - At Present, the environmental protection penetrates public awareness to decrease atmospheric emissions as important efforts for increasing living quality in air from various gaseous effects. Technically, it has forced industrial sectors to control pollutant productions while operating machineries of engineering processes to keep all contaminant materials. This condition has also forced the power system operation to modify operational strategies of thermal power plants considered pollutant productions from combustions of fossil fuels for reducing emissions. This paper demonstrates new approaches for measuring pollutant penetrations embedded in the single priority function considered an emission standard, a dynamic penalty factor, and Thunderstorm Algorithm (TA). By considering the IEEE 62-bus system model, results obtained show that the hourly computation has different performances for the 24 hours operation. It also indicates that pollutant discharges are dominated gradually by higher contributors associated with scheduled power plants. The convergence speed of TA is smooth and fast for determining the optimal solution, which are ranged in 6-20 for the cycle and 1.8-3.8 s for the time consumption. Moreover, the 24 hours operation is powered totally in 60,826.10 MW for feeding the total load of 56,820.50 MW. This operation also spends in 291,870.60 $ for the fuel procurement and 83,233.70 $ for the compensation of the pollutant production during existing 19 generating units. In total, the accumulation of pollutant discharges from 19 power plants is 68,012.20 kg.

KW - Economic operation

KW - Emission dispatch

KW - Penalty factor

KW - Power system

KW - Thunderstorm algorithm

UR - http://www.scopus.com/inward/record.url?scp=85032658885&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85032658885&partnerID=8YFLogxK

U2 - 10.18517/ijaseit.7.5.1635

DO - 10.18517/ijaseit.7.5.1635

M3 - Article

AN - SCOPUS:85032658885

VL - 7

SP - 1825

EP - 1831

JO - International Journal on Advanced Science, Engineering and Information Technology

JF - International Journal on Advanced Science, Engineering and Information Technology

SN - 2088-5334

IS - 5

ER -