Exact mean packet delay analysis for long-reach passive optical networks

Sumiko Miyata, Ken Ichi Baba, Katsunori Yamaoka, Hirotsugu Kinoshita

研究成果: Conference contribution

5 被引用数 (Scopus)

抄録

The long reach passive optical network (LR-PON) is a promising scheme for access networks that cover large areas. For designing an access network, an exact solution of the network performance (e.g., mean packet delay) is useful. Since long propagation delay causes unused time slots (idle time), and its effect on performance degradation is difficult to analyze, existing analysis of the LR-PON is done only for the no-idle time situation with modified optical line terminal (OLT) and each optical network unit (ONU). In this paper, we propose an exact solution of the mean packet delay for LR-PON with idle time. Our analytical solution is derived by a non-trivial extension of the existing work for the short range PON. We confirm a good match between the mean packet delay derived by the simulation and our analytical solution.

本文言語English
ホスト出版物のタイトル2015 IEEE Global Communications Conference, GLOBECOM 2015
出版社Institute of Electrical and Electronics Engineers Inc.
ISBN(印刷版)9781479959525
DOI
出版ステータスPublished - 2016 2 23
イベント58th IEEE Global Communications Conference, GLOBECOM 2015 - San Diego, United States
継続期間: 2015 12 62015 12 10

Other

Other58th IEEE Global Communications Conference, GLOBECOM 2015
国/地域United States
CitySan Diego
Period15/12/615/12/10

ASJC Scopus subject areas

  • コンピュータ ネットワークおよび通信
  • 電子工学および電気工学
  • 通信

フィンガープリント

「Exact mean packet delay analysis for long-reach passive optical networks」の研究トピックを掘り下げます。これらがまとまってユニークなフィンガープリントを構成します。

引用スタイル