LAYING AND CONSTRUCTION TECHNIQUE FOR THE FIRST STAGE OPTICAL SUBSCRIBER LOOP.

Fumihiro Nihei, Kazuo Yamaguchi, Hideo Kobayashi, Norio Kashima

研究成果: Chapter

抄録

Several kinds of technique for constructing first stage subscriber loops were investigated. The star network was adopted for fundamental line configuration. Simple cable laying techniques were developed, using a shaft drive winch with slipping mechanism. A non-airtight overhead connection box was developed for connecting overhead optical cables and drop cables. Using these techniques, a field trial was carried out in 1980. Designed performances and workability for the developed techniques were confirmed.

元の言語English
ホスト出版物のタイトルDenki Tsushin Kenkyusho Kenkyu Jitsuyoka Hokoku
ページ333-346
ページ数14
33
エディション2
出版物ステータスPublished - 1984
外部発表Yes

Fingerprint

Electric cable laying
Subscriber loops
Winches
Shafts (machine components)
Optical cables
Stars
Cables

ASJC Scopus subject areas

  • Engineering(all)

これを引用

Nihei, F., Yamaguchi, K., Kobayashi, H., & Kashima, N. (1984). LAYING AND CONSTRUCTION TECHNIQUE FOR THE FIRST STAGE OPTICAL SUBSCRIBER LOOP.Denki Tsushin Kenkyusho Kenkyu Jitsuyoka Hokoku (2 版, 巻 33, pp. 333-346)

LAYING AND CONSTRUCTION TECHNIQUE FOR THE FIRST STAGE OPTICAL SUBSCRIBER LOOP. / Nihei, Fumihiro; Yamaguchi, Kazuo; Kobayashi, Hideo; Kashima, Norio.

Denki Tsushin Kenkyusho Kenkyu Jitsuyoka Hokoku. 巻 33 2. 編 1984. p. 333-346.

研究成果: Chapter

Nihei, F, Yamaguchi, K, Kobayashi, H & Kashima, N 1984, LAYING AND CONSTRUCTION TECHNIQUE FOR THE FIRST STAGE OPTICAL SUBSCRIBER LOOP.Denki Tsushin Kenkyusho Kenkyu Jitsuyoka Hokoku. 2 Edn, 巻. 33, pp. 333-346.
Nihei F, Yamaguchi K, Kobayashi H, Kashima N. LAYING AND CONSTRUCTION TECHNIQUE FOR THE FIRST STAGE OPTICAL SUBSCRIBER LOOP. : Denki Tsushin Kenkyusho Kenkyu Jitsuyoka Hokoku. 2 版 巻 33. 1984. p. 333-346
Nihei, Fumihiro ; Yamaguchi, Kazuo ; Kobayashi, Hideo ; Kashima, Norio. / LAYING AND CONSTRUCTION TECHNIQUE FOR THE FIRST STAGE OPTICAL SUBSCRIBER LOOP. Denki Tsushin Kenkyusho Kenkyu Jitsuyoka Hokoku. 巻 33 2. 版 1984. pp. 333-346
@inbook{382096742857435a8a8ab9fc6747f9c3,
title = "LAYING AND CONSTRUCTION TECHNIQUE FOR THE FIRST STAGE OPTICAL SUBSCRIBER LOOP.",
abstract = "Several kinds of technique for constructing first stage subscriber loops were investigated. The star network was adopted for fundamental line configuration. Simple cable laying techniques were developed, using a shaft drive winch with slipping mechanism. A non-airtight overhead connection box was developed for connecting overhead optical cables and drop cables. Using these techniques, a field trial was carried out in 1980. Designed performances and workability for the developed techniques were confirmed.",
author = "Fumihiro Nihei and Kazuo Yamaguchi and Hideo Kobayashi and Norio Kashima",
year = "1984",
language = "English",
volume = "33",
pages = "333--346",
booktitle = "Denki Tsushin Kenkyusho Kenkyu Jitsuyoka Hokoku",
edition = "2",

}

TY - CHAP

T1 - LAYING AND CONSTRUCTION TECHNIQUE FOR THE FIRST STAGE OPTICAL SUBSCRIBER LOOP.

AU - Nihei, Fumihiro

AU - Yamaguchi, Kazuo

AU - Kobayashi, Hideo

AU - Kashima, Norio

PY - 1984

Y1 - 1984

N2 - Several kinds of technique for constructing first stage subscriber loops were investigated. The star network was adopted for fundamental line configuration. Simple cable laying techniques were developed, using a shaft drive winch with slipping mechanism. A non-airtight overhead connection box was developed for connecting overhead optical cables and drop cables. Using these techniques, a field trial was carried out in 1980. Designed performances and workability for the developed techniques were confirmed.

AB - Several kinds of technique for constructing first stage subscriber loops were investigated. The star network was adopted for fundamental line configuration. Simple cable laying techniques were developed, using a shaft drive winch with slipping mechanism. A non-airtight overhead connection box was developed for connecting overhead optical cables and drop cables. Using these techniques, a field trial was carried out in 1980. Designed performances and workability for the developed techniques were confirmed.

UR - http://www.scopus.com/inward/record.url?scp=0021574980&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=0021574980&partnerID=8YFLogxK

M3 - Chapter

AN - SCOPUS:0021574980

VL - 33

SP - 333

EP - 346

BT - Denki Tsushin Kenkyusho Kenkyu Jitsuyoka Hokoku

ER -